Shenzhen Goldtech Electronics Co., Limited
Main products:Integrated Circuits
Products
Contact Us
  • Contact Person : Ms. zhao michella
  • Company Name : Shenzhen Goldtech Electronics Co., Limited
  • Tel : 86-0755-83253272
  • Fax : 86-0755-83253171
  • Address : Guangdong,shenzhen,Room 11E lane C ,Huaqiang Plaza,
  • Country/Region : China
  • Zip : 518031

Dual 12 V MOSFET Driver with Output Disable adp3120a

Dual 12 V MOSFET Driver with Output Disable adp3120a
Product Detailed
(1)Dual 12 V MOSFET Driver with Output Disable adp3120a (2)sop8 & ad (3)original &instock

The ADP3120A is a dual, high voltage MOSFET driver optimized for driving two N-channel MOSFETs, the two switches in a nonisolated synchronous buck power converter. Each driver is capable of driving a 3000 pF load with a 45 ns propagation delay and a 25 ns transition time. One of the drivers can be bootstrapped and is designed to handle the high voltage slew rate associated with floating high-side gate drivers. The ADP3120A includes overlapping drive protection to prevent shoot-through current in the external MOSFETs.

All in one synchronous buck converter
One PWM generates both drives
Anti cross-conduction protection circuitry
Bootstrapped high side driver
OD for disabling the driver outputs
Meets CPU VR requirement when used with Flex-Mode controller

  

 

Shipping                                                                                                   

1>We will ship the items within 1-3 working days after the payment is received

2>We can ship to you by DHL/FEDEX/UPS/TNT and other express shipping,For the Countries & Regions where EMS cannot deliver,pls choose other shipping ways
3>If the goods need be paid  by ours,pls let us know,then can check the shipping fee or tell your shipping account.
4>We are not responsible for any accidents, delays or other issues after the express company collect the goods.
Guarantee
1>30days warranty,
2>if the goods could not work,pls return them to us within 30days
3>If you would like to return the goods to us,pls let us know within 3days of delivery
4>The buyer is responsible for all the shipping cost incurred
5>Any bad goods should issue  seller test report and the test factory need consignee


Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.